18:50 Kempton Park

Wednesday 10 December 2008

All18:2018:5019:2019:5020:2020:5021:20

Afm Services Data Centre Construction Handicap

  • 3YO plus  |   Class 5  |   5f  |   Standard  |   12 Runners  |   Unknown  |   Weighed In
  • Off time: -  |   Winning time: -
1st
Horse silk
4
(9)
9/1
T: J R JenkinsJ: D Holland
Made all, 3 lengths clear over 1f out, weakening towards finish, held on
2nd
Horse silk
0.5
12
(11)
6/1
T: P S McEnteeJ: L Morris
Prominent, chased winner 3f out, 3 lengths down and driven over 1f out, closed as winner weakened towards finish, just held
3rd
Horse silk
0.75
5
(12)
2/1
T: Mouse Hamilton-fairleyJ: Dane O'Neill
Held up, good headway on inside 2f out, chased leading pair over 1f out, ran on inside final furlong, looked held when nowhere to go near finish
4th
Horse silk
1.5
2
(3)
18/1
T: D K IvoryJ: J D O'Reilly
Soon ridden in mid-division, driven halfway, ran on inside final furlong
5th
Horse silk
hd
9
(1)
20/1
T: J R BoyleJ: M Dwyer
Chased leaders, ridden halfway, weakened inside final furlong
6th
Horse silk
0.5
6
(6)
9/1
T: J R BoyleJ: S J Drowne
Held up in rear, ran on inside final furlong, nearest finish
7th
Horse silk
nse
11
(7)
14/1
T: T KeddyJ: J Quinn
Took keen hold, chased leaders, ridden and no impression when hung right over 1f out, weakened final furlong
8th
Horse silk
nk
3
(10)
7/2
T: P R ChamingsJ: G Baker
Reared start, behind, kept on inside final furlong, never threatened leaders
9th
Horse silk
0.5
8
(4)
28/1
T: J M BradleyJ: M Geran
In rear, moderate headway final furlong
10th
Horse silk
nse
1
(8)
50/1
T: A B HaynesJ: P Nolan
Held up, always in rear
11th
Horse silk
2.5
10
(5)
25/1
T: M S SaundersJ: P Doe
Always towards rear, no chance final 2f
12th
Horse silk
2.5
7
(2)
16/1
T: C R DoreJ: Liam Jones
Chased winner for 2f, soon under pressure and behind

Betting Breakdown

Tricast:£150.74SF:£61.33

Forecasts

Musical Script (USA) (2/1), Woodcote (IRE) (7/2), Thoughtsofstardom (6/1), Bookiesindex Boy (9/1), Step It Up (IRE) (9/1), Wreningham (14/1), Desert Opal (16/1), Hereford Boy (18/1), Bertie Southstreet (20/1), Matterofact (IRE) (25/1), Monsieur Reynard (28/1), Caribbean Coral (50/1)

Prize Money

MOST READ RACING

Unlimited Replays
Image of a horse race faded in a gold gradientWatch and analyse all UK & Irish races with our Race Replays
Log in
Discover Sporting Life Plus benefits

RACING TIPS

Next Off